Boiler Operation – Start-up Procedure - Course No. 128

General procedures involved in putting a boiler on line.boiler
$50.00

Course No. 128

13 hours

Boiler Operation – Start-up Procedure

General procedures involved in boiler load increases; putting a boiler on the line; allowable warm-up rate; boiler start-up; filling a boiler with water; establishing a minimum stable flame; and identification of parts, such as pilot burner, manholes and hand holes, etc.

Prerequisites: Ability to read simple sketches and graphs and a basic knowledge of combustion, properties of steam, steam generating units, and normal boiler operation

Click to View Format.

Customers who bought this item also bought

Boiler Operation-Shutdown Procedures - Course No. 121

General procedures involved in boiler load reduction and in taking a boiler off line.
$36.50

Boiler Operation-Boiler Efficiency - Course No. 108

Boiler efficiency from an operator’s viewpoint, recognition of optimum boiler efficiency by observation of furnace conditions and steam generator instruments.
$35.00

Steam and the Steam Generating Unit - Course No. 87

Covers the characteristics of steam and the types and basic parts of industrial boilers.
$24.00

Gears and Gearing – Gear Ratios - Course No. 61

Identification of drive, driven gears and shafts; idler gears and their uses; direction of rotation and speed of rotation; formulas for gear ratio and speed ratio.
$34.00